City
Fermont, Quebec, Canada
Year of realisation
2010
Owner
Consolidated Thompson Iron Mines
Contract value
9 613 525 $
Engineer
BBA inc.
Contractor
Groupe SCV inc.
Supply and treatment of fresh water for the process steam consumption. Water treatment for the portion of fresh water supply and for the condensed and recirculated steam that is used for heating the administration buildings. Two boilers with each a capacity of 50 000 pounds of steam/hour. Central for reducing pression (connection of 100/15 psi). Boiler room (10M$) and administration buildings (6M$).
Service : Piping
Project number : 7057-8040